Showing posts with label Economy. Show all posts
Showing posts with label Economy. Show all posts

Wednesday, July 13, 2016

Temporary Power Can Put Ghana’s Economy Back on Track

A tipping point is a critical moment in a situation, process or system beyond which a significant effect or change takes place. It is the point at which a particular idea, product or event crosses a verge and gains notable momentum. As Malcolm Gladwell, author of book The Tipping Point sums it, it is the moment of critical mass, the threshold, the boiling point.

For Ghana, it was 2011 – when oil began flowing, and when the country’s economic growth zoomed above 14%. In the previous years, Ghana had already been showing impressive GDP growth numbers, as reported by the International Monetary Fund, chalking up an estimated eight per cent in 2008, five per cent in 2009, and seven per cent in 2010. But, it was in 2011 that the country reached the proverbial tipping point, making it one of Africa’s leading economic success stories.

The notable economic growth resulted in a significant improvement in the lives of Ghanaians. The country saw the emergence of a new middle class, which demanded a staggering amount of energy to power its lifestyle. Unfortunately, the Ghanaians’ requirement for electricity could not be fulfilled by the available power supply. This was admitted by then Ghana’s Power Minister Kwabena Donkor, when he said in an interview that Ghana’s power supply had not caught up with the surge in power demand prompted by the country’s exponential growth.

The shortage of electricity is threatening to rein in the economic momentum that Ghana had gained in recent years. In 2015, economic reports showed that Ghana’s growth forecast was down to 3.9 per cent, in the face of higher public spending and suppressed commodity prices. The power demand in the country, however, remained high, and this fact could pose a serious hindrance to further growth.

A solution to Ghana’s power challenges 

Ghana is no stranger to bouts with power insufficiency. Yet, the current power crisis has a particularly pronounced impact because of the heightened reliance on electrical power on the part of Ghana’s modern and developing economy. In fact, the International Monetary Fund (IMF) calls Ghana’s power crisis “the single-most important risk” to helping Ghana put its economy back on the strong path to growth.

To avoid further economic complications of Ghana’s power crisis, the country urgently needs a power solution that can be immediately delivered, installed and operated. In the face of issues of intermittency and unreliability among Ghana’s traditional power sources, the country needs a power solution that can guarantee a continuous and reliable supply of electricity anytime and anywhere it is needed.

Multi-megawatt temporary power solutions can open doors to a definitive resolution of Ghana’s power crisis.


The installation of temporary power plants does not call for extensive site preparation nor for the refurbishment of transmission and distribution grids. As soon as the generators and other power equipment arrive on site, they can be immediately installed, commissioned and powered on within days. In a matter of days, Ghana will be supplied with a consistent and reliable electricity supply.

Ghana’s government, power utility providers, nor industries and businesses need not spend scarce financial resources on capital expenditure, which is usually the case when procuring large-scale power equipment of building permanent power facilities. The government and other industry stakeholders can conveniently pay for the rented electricity from their operating revenues. As industry activities grow and the requirement for electricity increases, they can simply choose to add more power modules to the temporary power plant, precluding the need to buy additional equipment or build other permanent facilities. By the same token, in case the power requirement decreases, the load of the temporary power plant can be proportionally adjusted.

Temporary power providers offer a full range of services, including operating and maintaining the power plants. Temporary power providers have well-trained, expert engineers that will ensure that the power plants run at the optimal level all the time.

As Ghana’s eases through its power challenges, and as soon as the requirement for supplemental electricity passes, the government or the power utilities can simply choose to end the temporary power contract. The entire temporary power plant will be demobilized, leaving no idle power equipment nor permanent power plants running on part-load and requiring constant maintenance, servicing and upgrades.

Path to strong growth

Ghana is one of Africa’s biggest success stories. The country’s economic growth in recent years has been nothing short of astounding. Modern and industrializing economies, such as that of Ghana, need an efficient and reliable supply of electricity to sustain their activities and take off. Temporary power solutions can provide Ghana with the much needed boost in power supply, making inroads into a sustainable and viable economic recovery.

Spotlight on Africa’s power sector at the AEF 2016

The development of Africa’s power sector was in focus at the 2016 Africa Energy Forum (AEF 2016), in late June in London, UK. Altaaqa Global is proud to have taken an active role in the event, which had thrown the spotlight on the latest innovations that drive the growth of Africa’s energy sector, including temporary power technologies. Altaaqa Global had the opportunity to talk to various industry stakeholders about its multi-megawatt rental power plants, and how it can help African countries gain access to reliable electricity.

End

Monday, August 11, 2014

Road to Growth

Economic excitement is back in many countries in the world. Construction activities have picked up, investment is flowing and manufacturing has once again gained momentum. India’s economy, for instance, reflects a buoyant growth rate of around 5.3% in 2014 and 5.8% in 2015, riding high on intense government and private sector funding and on an aggressive push to build new and improve on existing public and industrial facilities. Naturally, India’s new found economic vitality has attracted entities and professionals from all over the world to set up shop and work in the country, respectively. From information technology to industrial manufacturing to consumer goods, the best global brands are flocking to India as a safe bet of investment.



While the foregoing bodes well for the future of the country and its people, the frenetic pace of economic and social activities in India is taking its toll on the country’s power supply. A study conducted by India’s Central Electricity Authority reported that energy deficiency would be felt across the country and that the spare power capacity of the northern regions would gradually recede. The situation described above has actually been looming for a time now: Recorded data in recent years showed that demand for energy in India had consistently outstripped the supply, both in terms of base load energy and peak availability. India, the data suggested, registered an 8.5% deficit in base load requirement and 9.8% short-fall in peak load requirement.

The government, in recognition of the foregoing, had initiated rural and urban electrification projects that comprised power plants that run on traditional and alternative energy sources. The discrepancy between the rates of the addition of electric power supply and the growth of demand, however, is that wide that the available energy is never enough to fulfill the requirement. And the gap is observed to be continuously growing, whether in generation, transmission or distribution….

The repercussion of the power deficiency is real. In 2012, a massive blackout left 700 million people in India without electricity. In what is touted to be one of the worst blackouts in history, 20 of India’s 28 states suffered the effects of the power interruption that almost incited social instability and protest for fears that the country was no longer able to support its booming local energy demand.
With the feverish growth rate of economic and social activities in India, the country’s demand for electricity should show no signs of slowing down.

How can energy be sustained?
One has to face the truth that permanent power plant projects cannot be completed in days or months. Permanent energy facilities may take decades to complete, as planning, designing, approving, constructing and commissioning them entail time, effort and processes that go through different channels. What, then, can be done? Is there anything that can possibly support the permanent infrastructure while the new ones are being built?

Temporary power generation companies, like Altaaqa Global CAT Rental Power, have the technologies that have the capacity to support the existing power generation infrastructure, bridging the gap in electricity supply as, where and when the necessity be. In times when the power demand heavily outstrips the supply, rental power generators, running on diesel for example, can prove to be viable and affordable sources of energy to avoid disastrous power interruptions, unscheduled load shedding and widespread blackouts.

Though some parts of the country may have occasional spare power capacity, its availability may be periodic and can be severely affected by a disrupted seasonal pattern. For instance, some parts of the country where hydroelectric power stations operate may experience droughts or prolonged absence of rain, which in turn can drastically reduce the power generation capacity of the said plants. Solar or photovoltaic farms thrive during summer months but may experience shortage in production in months when days are predominantly cloudy or rainy. In these cases, rental power plants may support the power generation capacity of the current facilities to bridge the gap during the crucial months of seasonal change.

With its booming industrial manufacturing sector, production facilities in India often need to double, may be even triple, their capacities to meet the international production requirement in certain months, say during Christmas or Diwali. The consequent spike in power consumption may usher in operational challenges. It is highly probable that during the peak months, utility companies will set ceiling caps for electricity consumption or will ask production facilities to pay an additional consumption premium during peak hours. In this case, based on cost-benefit studies conducted among industries within the arc of peak months, it will be more economically sound for manufacturing facilities to hire temporary power plants than to pay an additional fee for every peak kilowatt used, shut down parts of the production complex when power usage is at its peak, or pay a hefty fine for using more power than what has been allocated. Peaker power plants (peakers for short) are an ideal solution offered by energy rental companies to curb seasonal electricity demand during peak production months.



Power partner checklist
To fully capitalize on the advantages of temporary power technologies, the governments and the utility companies in India need to be discerning in hiring an interim energy service provider. In selecting a temporary electricity partner, one should look at the provider’s experience, organization, support system, rate of deployment and equipment reliability and sustainability before signing an agreement with it.

One of the most important things to consider when entering into an agreement with a rental energy provider is its track record in delivering executable, measurable and sustainable solutions to a wide array of projects. If the mobile generator company cannot supply the required power, it may cause more delays in the project, eventually leading to legal disputes and further economic damages. The Indian government and utility companies should avoid dealing with backyard rental companies that will over-promise but will eventually under-deliver. One should ask, ‘Can we really trust mom-and-pop rental power companies when we are supplying power to airports, hospitals, mining facilities, telecommunication entities and petrochemical companies?’

Though temporary power plants are engineered to endure even the harshest conditions known to man, they are by no means indestructible. The governments and the utility companies in India must keep in mind that the service of a rental energy company should not end when the electric power generators are switched on. The company should have the spare parts and the human resources to carry out after-sales support to installed and commissioned projects at any given location, at any given time. One should ask, ‘Do we stop a 100 MW power plant simply because there was no available spare part?’

An interim energy partner should have the capability to react, deploy, mobilize and commission temporary power plants at a moment’s notice. This means that the provider should have available equipment and manpower on the ground to carry out a rapid delivery. If the power rental company has the available equipment to deploy and a team of professional logistic personnel that can deal with the complexities of ports, customs and transportation, it can immediately solve the power crisis.

Providing solutions to power requirement of different entities does not follow a template nor is it governed by a rule of thumb. Each case should be carefully studied and evaluated in order for rental power companies to prescribe an optimal solution. The only way that an interim energy company can afford to meet the exact requirement of any client is for it to have the adequate and state-of-the-art technologies available in its product line.

Now, there is a solution
The power supply situation in India does not have to be a Catch-22. India could not possibly turn its back on investors and professionals saying that they could not stay in the country because they would eventually consume electricity, putting more pressure on the country’s power facilities. On the other hand, India could not go on growing its economy at the expense of its limited power supply that, when severely overwhelmed, might eventually collapse and cause a massive socio-economic tragedy. In times of tough choices, such as this, rental power plants can make a difference. With interim generators supporting the existing power infrastructure, India can go on its road to economic growth without sacrificing the country’s energy supply. While the permanent power facilities are underway, rental energy plants can bridge the electricity gap, allowing India to power its way to a brighter future.

End

*The foregoing article was published in the July 2014 issue of Power Line magazine (India Infrastructure Publishing, India).*



PRESS INQUIRIES
Robert Bagatsing
Altaaqa Global
Tel: +971 56 1749505
rbagatsing@altaaqaglobal.com